Selected projects
Drukarka 3D
April 2019
Branża: Budowa maszyn Opis Inwestycji: Zadanie polegało na wykonaniu drukarki 3D umożliwiającej drukowanie modeli prototypowych. Zakres inwestycji: budowa drukarki 3D pracującej w układzie ...
(PL) Modernizacja sterowania dystrybutora czekolady
September 2018
Sorry, this entry is only available in Polish.
Sterowanie transportem i dozowaniem materiałów sypkich
February 2018
Data: 2018 marzec Branża: Chemiczna, taśmy klejące Opis inwestycji: Realizacja polegała na stworzeniu automatycznie sterowanego systemu transportu oraz dozowania materiałów sypki...
Silos for potato starch
November 2016
The task related to the development of the transmission of potato flour control to silo (30 thous tons).
The transport system of silica
August 2016
Project included the preparation of control for the entire transport system of silica.
Modernization of the security system and control of forming robot
April 2016
The task involved the exchange of control system and building a security system in accordance with the requirements of Performance Level d based on category 3 and LOTO procedures.
Modernization of machine making radiator’s connections
April 2016
The project included the replacement of the manufacturer’s control machine for a new control according to Investor’s standards.
Modernization of sewage treatment plant control
October 2015
Removal of the control system based on PLC Siemens S7-300 with operator panel Siemens and the transition to solutions in accordance with company policy.
Line of mixing powder
September 2015
The range of investments: preparation of the AKPiA project, deliveries for the prefabrication of control cabinets, supply the SCADA software licenses...
Drying briquette
April 2015
The range of investments: preparation of the AKPiA project, deliveries for the prefabrication of control cabinets, supply the SCADA software licenses...
Mixing and packing line for chemical substances
February 2015
The automation system installation producing washing liquids for dairy factory.
Modernization of the security system and traying robot control
February 2015
Exchange control system and building a security system in accordance with the requirements of Performance Level d based on category 3 and LOTO procedures.
Production line for e-cigarettes liquids
August 2014
Preparation of the control for the production line which prepares mixtures for e-cigarettes.
Bead wire – replacement of servo drive
July 2014
Exchange of control and servo drive system on the machine for the production of bead wire.
The modernization of a security system and packaging robot control
April 2014
The task involved the exchange of control system and building a security system in accordance with the requirements of Performance Level d based on category 3 and LOTO procedures.