Selected projects

Drukarka 3D

April 2019

Branża: Budowa maszyn Opis Inwestycji: Zadanie polegało na wykonaniu drukarki 3D umożliwiającej drukowanie modeli prototypowych. Zakres inwestycji: budowa drukarki 3D pracującej w układzie ...

(PL) Modernizacja sterowania dystrybutora czekolady

September 2018

Sorry, this entry is only available in Polish.

Sterowanie transportem i dozowaniem materiałów sypkich

February 2018

Data: 2018 marzec Branża: Chemiczna, taśmy klejące Opis inwestycji: Realizacja polegała na stworzeniu automatycznie sterowanego systemu transportu  oraz dozowania materiałów sypki...

Silos for potato starch

November 2016

The task related to the development of the transmission of potato flour control to silo (30 thous tons).

The transport system of silica

August 2016

Project included the preparation of control for the entire transport system of silica.

Modernization of the security system and control of forming robot

April 2016

The task involved the exchange of control system and building a security system in accordance with the requirements of Performance Level d based on category 3 and LOTO procedures.

Modernization of machine making radiator’s connections

April 2016

The project included the replacement of the manufacturer’s control machine for a new control according to Investor’s standards.

Modernization of sewage treatment plant control

October 2015

Removal of the control system based on PLC Siemens S7-300 with operator panel Siemens and the transition to solutions in accordance with company policy.

Line of mixing powder

September 2015

The range of investments: preparation of the AKPiA project, deliveries for the prefabrication of control cabinets, supply the SCADA software licenses...

Drying briquette

April 2015

The range of investments: preparation of the AKPiA project, deliveries for the prefabrication of control cabinets, supply the SCADA software licenses...

Mixing and packing line for chemical substances

February 2015

The automation system installation producing washing liquids for dairy factory.

Modernization of the security system and traying robot control

February 2015

Exchange control system and building a security system in accordance with the requirements of Performance Level d based on category 3 and LOTO procedures.

Production line for e-cigarettes liquids

August 2014

Preparation of the control for the production line which prepares mixtures for e-cigarettes.

Bead wire – replacement of servo drive

July 2014

Exchange of control and servo drive system on the machine for the production of bead wire.

The modernization of a security system and packaging robot control

April 2014

The task involved the exchange of control system and building a security system in accordance with the requirements of Performance Level d based on category 3 and LOTO procedures.
Strona 1 z 212